#167A - Siemens Switch Board and Allen Bradley Control Center
All electrical going to equipment unless otherwise lotted. And not pertaining to building. 40’ of Centerline control center buckets, parts in control room, large soft starters. This lot will require removal by designated rigger and will have a pre determined fee. All wiring inside of the electrical room. Wires are to be cut at the spot where they exit the electrical room.